EtherCAT or CANopen for Machine Motion
A neutral EtherCAT-versus-CANopen workflow for machine motion, covering controller support, synchronization, topology, profiles, diagnostics and commissioning.
Read engineering guide
Engineering knowledge hub
Use this hub to turn an automation question into a reviewable engineering workflow. The guides cover protocol mapping, controller migration, component selection, motion and AGV sizing, and sourcing documents. Each article states its evidence boundaries, keeps commercial terms confirmed at RFQ, and points to the relevant product, service, glossary or document-request page.
03 guides
Map data, roles, timing and fault behavior across industrial networks.
A neutral EtherCAT-versus-CANopen workflow for machine motion, covering controller support, synchronization, topology, profiles, diagnostics and commissioning.
Read engineering guide
A practical workflow for connecting a Kinco HMI to a PLC: verify interfaces and roles, build the tag map, bench-test writes, and diagnose bad values.
Read engineering guide
A practical workflow for mapping CANopen objects to Modbus registers, including data ownership, timing, diagnostics, failure states and bench validation.
Read engineering guide01 guides
Plan controller and software transitions around evidence and acceptance tests.
A controller-neutral workflow for rebuilding an existing PLC application in CODESYS, from source inventory and I/O mapping to bench tests and commissioning.
Read engineering guide01 guides
Turn application requirements into a reviewable component shortlist.
Five application factors to review before selecting a variable frequency drive: motor data, load and duty, control, installation, and system interfaces.
Read engineering guide01 guides
Size and commission motion hardware from the machine duty and safety case.
A practical AGV servo-wheel sizing workflow covering vehicle inputs, tractive force, wheel torque and speed, duty, braking, thermal limits, and safety review.
Read engineering guide01 guides
Verify documents, order scope and commercial assumptions before RFQ.
How to scope Commercial Invoices, Packing Lists, Certificates of Origin, RoHS records and related documents for an exact industrial component order.
Read engineering guideNext step
Send the installed devices, interfaces, operating conditions and required documents. Availability, price and lead time are confirmed at RFQ.