Skip to main content
SearchRequest review

For · OEMs and machine builders

Build the machine around reviewed choices

For prototype and series machines, Automation Liberty reviews the BOM against the application before quotation. Selection boundaries are documented; availability, lead time, price and warranty terms are confirmed for the exact order at RFQ.

Operator panels wired on a build bench, cable looms laid out beside them
Customer site — panels being built up before installation.

What you are actually deciding

Which control platform the machine is built around

The controller decides the programming environment, fieldbus, spares route and who can service the machine for years. Changing it after the prototype is expensive.

Catalogue part or built to your design

Part of a machine is standard components. The rest is defined by your drawing and has to be manufactured, not ordered.

Who answers a fault after the machine ships

A series machine outlives the project team. The support route for components, program and documentation is a design decision, not a purchasing one.

What the engineering desk contributes

BOM review

Model selection, variant boundaries, documentation needs, availability and commercial terms are reviewed against the exact machine request and confirmed at RFQ.

Candidate alternates

Lifecycle or sourcing risks can be mapped to candidate replacements — subject to engineering review of interfaces, software, mechanics and safety.

Development support

Available datasheets, wiring information and integration notes can be included in the agreed DV or PV support scope.

Series planning

Repeat-SKU supply paths, quantity tiers, lead time and per-unit pricing are confirmed at quotation rather than promised as standing terms.

How the request moves

01
Send the machine context

Share the BOM, operating requirements, current models and any documentation constraints.

02
Define the boundary

Engineering separates component selection from software, panel, commissioning and machine-validation responsibilities.

03
Review the candidate BOM

Each proposed line is checked against the application and any cross-brand item is clearly marked as a candidate.

04
Confirm the quotation

Exact variants, quantity, price, availability, lead time, warranty terms and deliverables are confirmed at quotation.

Where this connects

Automation Liberty works in three ways. These are the ones that normally apply to you.

What we do not do

  • We do not certify your machine. CE, UL and system-level safety approval remain with the responsible equipment owner; we supply component-level documentation.
  • A candidate replacement is not a compatibility promise. Interfaces, software, mechanics and safety remain subject to engineering review for your specific machine.
  • Series pricing and lead time are confirmed per order and quantity. No standing supply level or price is implied by this page.
  • Machine-level validation, acceptance testing and final design approval stay with your engineering team.

Questions asked before the first order

How do I choose a PLC for a new machine?

Work from the application: axes and motion type, I/O and signal types, fieldbus, the programming environment your team can maintain, and environment and lifecycle. Those inputs narrow the family before any model number is useful.

Can you manufacture parts to my drawing?

Yes. Mechanical parts, sub-assemblies, panel builds and complete units run as a sourcing programme — supplier qualification, agreed inspection scope, production coordination — because correctness is defined by your drawing.

Who supports the machine after it ships?

Component-level support for supplied lines runs from Shenzhen, with a Bangkok centre for Southeast Asia. Machine-level service to your end customer stays with you unless separately agreed.

Can you supply the same BOM for a series after the prototype?

Yes — repeat supply is planned from the reviewed BOM with revision points recorded, so later batches match the first. Price and lead time are confirmed per order; lifecycle risks are flagged when identified.

Bring the BOM and machine context

Send current models, operating requirements, quantity and target date for a scoped review.

Submit BOM
OEMs and machine buildersSubmit BOM