Skip to main content
SearchRequest review

For · System integrators

Cross-reference the hardware; expose the rework

A migration is more than a part-number match. Automation Liberty helps integrators identify candidate hardware, software dependencies, wiring changes and commissioning boundaries before the work is quoted.

A row of PLCs and I/O modules wired on a cabinet backplate with numbered ferrules
Customer site — controllers and I/O in one cabinet.

What you are actually deciding

Whether the cross-reference actually holds

A paper match can still differ in signal type, scan behaviour, instruction set or mounting. The question is what changes when you fit it.

How much of the program is rework, not conversion

Platform-specific logic, drivers and safety interfaces do not carry across. Knowing that share before quoting is the difference between margin and loss.

Where your responsibility ends

Supply, re-implementation, panel changes and acceptance are four scopes. Quoting them as one is how migrations overrun.

What the engineering desk contributes

Cross-reference scope

Competitor part numbers are mapped to candidate replacements — subject to engineering review of electrical, mechanical, software and safety constraints.

Logic re-implementation

Projects from TIA Portal, GX Works, Sysmac or other ecosystems are reviewed for explicit logic, library and I/O re-implementation in the target environment.

Panel and wiring review

Terminal layout, signal type, I/O map, communications and EMC considerations are checked against the available drawings and application.

Commissioning boundary

Remote guidance or site work is included only when its access, deliverables and responsibilities are explicitly scoped and confirmed at quotation.

How the request moves

01
Provide the source set

Send the current program, drawings, I/O list, device list and machine acceptance requirements that are available.

02
Audit dependencies

Engineering identifies platform-specific logic, drivers, protocols, safety interfaces and undocumented assumptions.

03
Define the rework

The proposal states what carries over, what is re-implemented and what must be validated at bench or machine level.

04
Confirm the work scope

Deliverables, access, quotation, availability and scheduling are confirmed after the technical boundary is understood.

Where this connects

Automation Liberty works in three ways. These are the ones that normally apply to you.

What we do not do

  • We do not auto-convert STEP 7, GX Works, RSLogix or TIA Portal programs. Logic is re-engineered with explicit I/O mapping, and the rework is stated before it is quoted.
  • A candidate replacement is not a compatibility promise and remains subject to engineering review for your specific machine.
  • Machine-level safety, compliance and acceptance stay with the responsible integrator. We supply component-level documentation.
  • Site commissioning is included only when access, deliverables and responsibilities are explicitly scoped and confirmed at quotation.

Questions asked before the first order

How do I find a replacement for a discontinued PLC?

Start from what the machine does: I/O and signal types, fieldbus and protocol devices, motion, safety scheme and the existing program. A candidate is identified against those with its differences listed — and stays subject to engineering review.

How much rework is involved in switching PLC brands?

It depends on how much of the program is platform-specific. Standard logic usually re-implements cleanly; vendor libraries, motion blocks, drivers and safety configuration are rebuilt with explicit I/O mapping. The audit separates the two before quoting.

Can you convert my existing PLC program automatically?

No — automatic conversion carries platform assumptions into a different runtime, where they fail at commissioning. Logic is re-implemented in the target environment with a stated I/O map.

Do you support commissioning on site?

Remote guidance is the normal route and can be scoped with the programming work. On-site attendance is quoted separately, with access, deliverables and responsibilities agreed in writing first.

Scope the migration before quoting it

Send the source project and available machine documentation so the conversion boundary can be reviewed.

Request application review
System integratorsRequest application review